For the week of August 31 – September 6, 2026, the permit count in Somerville stood at 117. The prior week produced 111. Jobs classified as electrical made up 35 of the 117 filings, part of a mix that included 14 trades. Against a four-week average of 107, the weekly total represents a +5% change from the period before.
| Trade | Permits |
|---|---|
| Electrical | 35 |
| HVAC | 27 |
| Plumbing | 22 |
| Roofing | 7 |
| New Construction | 6 |
| Gas | 4 |
| Building | 3 |
| Windows/Doors/Siding | 3 |
Streets with new filings: Adams St, Alston St, Assembly Park, Assembly Row, Belmont St, Bolton St, Bonner Ave, Broadway and 71 more.